What is the difference between Route A and Route B?
Route A is for people who already have manufacturing files such as STL, STEP, Gerber or a BOM: we check them, then print or fabricate. Route B is for people who have only a requirement: we do the CAD or board design, you approve it, and then we manufacture.
How long does fabrication take?
Route A typically takes 2 to 7 working days. Route B takes 3 to 10 working days for design, followed by manufacture. Indicative lead times are FDM printing 2 to 4 days, resin 3 to 5 days, 2 layer PCBs 5 to 7 days and 4 layer PCBs 7 to 10 days.
Is the online estimate a firm quote?
No. The estimator works from a bounding box, and a thin-walled part and a solid block of the same size do not cost the same. A firm quote needs your file.
What files should I send for 3D printing?
Send STL or STEP, with STEP preferred because it keeps the real dimensions. Keep FDM wall thickness at or above 1.2 mm. Tell us the material and infill, or ask us to choose, and say which faces matter cosmetically.
What do you need for PCB fabrication?
Send Gerber RS-274X plus an Excellon drill file, or the native project, which lets us fix problems rather than only report them. Also give the layer count, board outline, finished thickness, solder mask and silkscreen colour, and the surface finish (HASL or ENIG).
Will I get the source files if you design the part or board?
Yes. Source files are handed over for design work and consultancy, so you are not locked in and can take the work to another supplier.
How does a consultancy engagement work?
It runs in five steps: enquiry, a scoping call within 48 hours, a written proposal, the build with weekly written updates, and handover of hardware, source files, firmware and documentation.